信息系統(tǒng)項(xiàng)目管理師每日一練試題內(nèi)容(2020/4/4)
試題1: 五項(xiàng)任務(wù)需要分配到四種不同型號(hào)的機(jī)器上來執(zhí)行。四種型號(hào)的機(jī)器分別有25、30、20和30臺(tái)。五項(xiàng)任務(wù)的工作量分別是20、20、30、10和25,不能把第四類機(jī)器分配到第四項(xiàng)任務(wù)上。每項(xiàng)任務(wù)當(dāng)中的每個(gè)工作量在執(zhí)行時(shí)需占用任意型號(hào)的1臺(tái)機(jī)器。各類機(jī)器分配到各項(xiàng)任務(wù)時(shí)所發(fā)生的單位成本(每個(gè)工作量所需的萬元數(shù))如下表所示:
任務(wù)分配的最優(yōu)分配方案中,總成本是( )萬元。
A、500
B、605
C、560
D、520
Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the( )
A. project management plan
B. project baseline
C. risk response plan
D. risk baseline
在進(jìn)行項(xiàng)目文檔及配置管理時(shí),引入“基線”這一概念的目的是()。
A.保證成果的完整與正確
B.合理分配權(quán)限
C.保證成果相互依賴性
D.合理控制變更
( )不屬于信息系統(tǒng)審計(jì)的主要內(nèi)容。
A、信息化戰(zhàn)略
B、資產(chǎn)的保護(hù)
C、災(zāi)難恢復(fù)與業(yè)務(wù)持續(xù)計(jì)劃
D、信息系統(tǒng)的管理、規(guī)劃與組織
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |