系統(tǒng)集成項目管理工程師當(dāng)天每日一練試題地址:www.xomuzic.com/exam/ExamDay.aspx?t1=2
往期系統(tǒng)集成項目管理工程師每日一練試題匯總:www.xomuzic.com/class/27/e2_1.html
系統(tǒng)集成項目管理工程師每日一練試題(2020/6/7)在線測試:www.xomuzic.com/exam/ExamDay.aspx?t1=2&day=2020/6/7
點擊查看:更多系統(tǒng)集成項目管理工程師習(xí)題與指導(dǎo)
系統(tǒng)集成項目管理工程師每日一練試題內(nèi)容(2020/6/7)
試題1: 國家標(biāo)準GB/T16260《軟件產(chǎn)品評價——質(zhì)量特性及其使用指南》規(guī)定了軟件產(chǎn)品的6個質(zhì)量特征,他們是( )。
A、功能性、可靠行、易用性、效率、可維護性、可移植性
B、功能性、壽命、可信性、安全、可維護性、可移植性
C、功能性、無形性、經(jīng)濟性、效率、可維護性、可移植性
D、功能性、同步性、可信性、安全、可維護性、可移植性
以下不屬于物理訪問控制要點的是()
A、硬件設(shè)施在合理范圍內(nèi)是否能防止強制入侵
B、計算機設(shè)備的鑰匙是否具有良好的控制
C、計算機設(shè)備電源供應(yīng)是否能適當(dāng)控制在合理的規(guī)格范圍內(nèi)
D、計算機設(shè)備在搬動時是否需要設(shè)備授權(quán)通行的證明
( )不屬于成本管理過程
A、資源計劃過程
B、成本估計過程
C、成本預(yù)算過程
D、合同評審過程
某系統(tǒng)集成企業(yè)迫于經(jīng)營的壓力,承接了一個極具技術(shù)風(fēng)險的項目,該項目的項目經(jīng)理為此:調(diào)用了公司最有能力的人力資源,組織項目組核心團隊成員培訓(xùn),與該項目技術(shù)領(lǐng)域最強的研究團隊簽訂項目技術(shù)分包協(xié)議,從項目風(fēng)險管理的角度來看,該項目經(jīng)理采取了(1)的應(yīng)對策略,并采取了(2)風(fēng)險應(yīng)對措施
(1)A、應(yīng)急風(fēng)險
B、正向風(fēng)險
C、轉(zhuǎn)移風(fēng)險
D、負面風(fēng)險
(2)A、轉(zhuǎn)移、分享、提高
B、開拓、接受、提高
C、減輕、分享、規(guī)避
D、開拓、分享、強大
根據(jù)軟件生命周期的V模型,系統(tǒng)測試主要針對(),檢查系統(tǒng)作為一個整體是否有效地得到運行
A、概要設(shè)計
B、項目范圍說明書
C、項目管理計劃
D、需求規(guī)格說明書
Estimating schedule activity costs involves developing an(1 )of the costs of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in most application areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estimates are generally expressed in units of (2 )to facilitate comparisons both within and across projects. The(3 )describes the business need, justification, requirements, and current boundaries for the project. It provides important information about project requirements that is considered during cost estimating.
(1)A. accuracy B. approximation C. specification D. summary
(2)A. activity B. work C. currency D. time
(3)A. project scope statement
B. statement of work
C. project management plan
D. project policy
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學(xué)員考試保駕護航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |